Draughtsman (Civil)
RATE ANALYSIS
Set 1
Set 1
Practice Mode
Share
Next
Set Completed!
0
/
5
0%
Next Set
Q2879
Permalink
Report
What is the out-turn of mason constructing stone arch work?
A
0.40 cu.m
B
0.55 cu.m
C
0.80 cu.m
D
0.90 cu.m
Q2880
Permalink
Report
What is the out-turn of mason, constructing superstructure with brick masonry?
A
0.55 cu.m
B
0.85 cu.m
C
1.00 cu.m
D
1.25 cu.m
Q2881
Permalink
Report
What percentage contractors profit is included in the analysis of rate?
A
5
B
10
C
15
D
20
Q2882
Permalink
Report
What quantity bitumen is required for 100m<sup>2</sup> first coat painting on DPC?
A
75 kg
B
100 kg
C
125 kg
D
150 kg
Q2883
Permalink
Report
What quantity of stone is required for 1m<sup>3</sup> of rubble masonary?
A
0.5 cu.m
B
0.75 cu.m
C
1.00 cu.m
D
1.25 cu.m
‹
1
2
3
4
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...