QuizApp
Home
Teacher
Login
Register
Guest Mode
Student
Login
Register
Guest Mode
Dashboard
Study MCQ
Draughtsman (Civil)
PRE FABRICATED STRUCTURES
Set 2
Set 2
Practice Mode
Share
Prev
Next
Set Completed!
0
/
5
0%
Next Set
Q2828
Permalink
Report
What is the minimum distance between centres of any two adjacent rivet holes to the nominal diameter of the rivet is ? 25mm?
A
Nominal diameter +1.0mm
B
Nominal diameter +1.5mm
C
Nominal diameter +2.0mm
D
Nominal diameter +2.5mm
Q2829
Permalink
Report
What is the first stage of prefabricated structure construction?
A
Testing of raw materials
B
Procurement of raw materials
C
Concrete mix design
D
Reinforcement preparation
Q2830
Permalink
Report
Which part of the prefabricated building structure aim be constructed at site?
A
Roof slab
B
Foundation
C
Main beams
D
Fillers
Q2831
Permalink
Report
Which system facilitates assembling of minor elements in conventional construction?
A
Open pre-fab system
B
Partial pre-fab system
C
Full pre-fab system
D
Closed pre -fab system
Q2832
Permalink
Report
What is the name of assembling structural components at site?
A
Open pre-fab system
B
Partial pre-fab system
C
Full pre-fab system
D
Closed pre-fab system
‹
1
2
3
4
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...