Q2576
Permalink
Report
What is the unit for excavation in M.K.S system?
A
m
B
sq.m<sup>2</sup>
C
cu.m
D
No
Q2577
Permalink
Report
What is the minimum cubical quantity for bill quantity calculation?
A
1 mm<sup>3</sup>
B
1 cm<sup>3</sup>
C
0.01 m<sup>3</sup>
D
0.1 m<sup>3</sup>
Q2578
Permalink
Report
What is the unit for cement concrete in M.K.S. system?
A
Nos.
B
m
C
sq.m
D
cu.m
Q2579
Permalink
Report
What is the unit for brick work in cement mortar for superstructure in MKS system?
A
m
B
sq.m
C
cu.m
D
Nos.
Q2580
Permalink
Report
What is the unit for steel reinforcement bars etc in RCC, RB work in MKS system?
A
m
B
Nos.
C
Quintal
D
sq.m
‹
1
2
3
4
5
6
7
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...