QuizApp
Home
Teacher
Login
Register
Guest Mode
Student
Login
Register
Guest Mode
Dashboard
Study MCQ
Wireman
POWER WIRING OF MOTORS
Set 3
Set 3
Practice Mode
Share
Prev
Next
Set Completed!
0
/
5
0%
Next Set
Q14147
Permalink
Report
What should be prepared first to design and estimate a panel board?
A
Schematic diagram
B
Panel board
C
Switchgears list
D
Accessories list
Q14148
Permalink
Report
What is the next step involved in panel design after preparing Schematic diagram?
A
Preparation of wiring diagram
B
Panel board measurement
C
Preparation of accessories list
D
Preparation of Meter cabinet
Q14149
Permalink
Report
What is the cutting angle value of iron angle in panel boards?
A
90 Degree
B
75 Degree
C
60 Degree
D
45 Degree
Q14150
Permalink
Report
What is the minimum clear distance required between bare conductors in panel board?
A
2.5 cm
B
10 cm
C
3.8 cm
D
1.2 cm
Q14151
Permalink
Report
What is the name of device used to fix and hold cables in a secure manner inside the panel board?
A
Thimbles
B
Grommets
C
Wire ferrules
D
Wire clip
‹
1
2
3
4
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...