Q14027
Permalink
Report
Which is the clearance between live conductors in OH.LT. vertical configuration?
A
20 cm
B
30 cm
C
40 cm
D
50 cm
Q14028
Permalink
Report
What is the purpose of applying grease in binded aluminium joints in OH lines?
A
Avoid sparking
B
Avoid oxidation
C
Avoid loose connection
D
Fill the gap between turns
Q14029
Permalink
Report
What is minimum clearance between earth and live conductor in LT vertical configuration?
A
10 cm
B
15 cm
C
25 cm
D
30 cm
Q14030
Permalink
Report
Which is the conductivity of aluminium compared to copper?
A
0.3
B
0.4
C
0.5
D
0.6
Q14031
Permalink
Report
Which is the height of bus-bar assembly to be installed from ground?
A
1 m
B
1.5 m
C
2 m
D
2.75 m
‹
1
2
...
6
7
8
9
10
11
12
13
14
15
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...