QuizApp
Home
Teacher
Login
Register
Guest Mode
Student
Login
Register
Guest Mode
Dashboard
Study MCQ
Wireman
ESTIMATION AND COSTING OF WIRING
Set 5
Set 5
Practice Mode
Share
Prev
Next
Set Completed!
0
/
5
0%
Next Set
Q13960
Permalink
Report
What is the first step taken during preparation of estimating the material required for any type of wiring installation?
A
Take the lay out
B
Purchase accessories for testing
C
Prepare instruments for testing
D
Purchase cables testing
Q13961
Permalink
Report
Which load is to be connected from stand by generator set in the event of failure of mains?
A
Garden lighting
B
Portico lighting
C
Fire lift and water pumps
D
Playing area lighting
Q13962
Permalink
Report
Which is the recommended height of energy meter to be installed from floor level in commercial wiring as per IE rule?
A
Not less than 1m
B
Not less than 1.5m
C
Not less than 2m
D
Not less than 2.5m
Q13963
Permalink
Report
Which is to be considered before the selection of conductor, protective devices and switch gear in commercial wiring?
A
Diversity factor
B
Type of wiring
C
Place of wiring
D
Climatic conditions
Q13964
Permalink
Report
Where the location of main switch in a domestic wiring installation?
A
Near to load centre
B
Near to termination of service line
C
Out side wall of building
D
Near main door
‹
1
2
3
4
5
6
7
8
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...