Which location, the IC cut out is to be connected in service meter board?
A
Between main switch and distribution board
B
Between energy meter and main switch
C
First position of the service meter band
D
Last position of the service board connection
Q13671
Permalink
Report
What is the minimum height of energy meter fixing as per NE code of practise and IE rules?
A
1 metre
B
1.5 metre
C
1.75 metre
D
2 metre
Q13672
Permalink
Report
Which tool is used to make holes for fixing meter board in walls during wiring?
A
Pipe jumper
B
Rawl jumper
C
Cold chisel
D
Crow bar
Q13673
Permalink
Report
What is the use of Rawl jumper while fixing energy meter board on wall?
A
To make pilot hole on the wooden gutties
B
To make holes on the bricks
C
To mark the hole points on the wall
D
To make grooves on the concrete
Q13674
Permalink
Report
Where the wooden gutties are used in wiring?
A
Wooden board
B
Metal board
C
Rigid walls
D
Non-rigid walls
‹
1
2
3
4
5
6
7
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...