Q13086
Permalink
Report
How much time it takes for the thermit mould to cool, after welding by thermit process?
A
7 Hrs
B
9 Hrs
C
10 Hrs
D
12 Hrs
Q13087
Permalink
Report
What is the reason that obstructed joints cannot be welded by electron beam welding process?
A
Electron beam travel in curved line
B
Electron beam travel in different direction
C
Electron beam travel only in straight line
D
Electron beam travel in circular line
Q13088
Permalink
Report
How much gas flow rate is required to weld a butt joint with 0.8 mm dia MS filler rod of wire feed rate 3 - 4 m/min at 18 to 20 volts?
A
to 8 Lpm
B
8 to 10 Lpm
C
10 to 12 Lpm
D
12 to 14 Lpm
Q13089
Permalink
Report
What should be the initial angle of two plates in a T joint if the final angle between them is 90 Degree after completion of welding?
A
93 Degree
B
90 Degree
C
85 Degree
D
75 Degree
Q13090
Permalink
Report
What is percentage of deposition efficiency in FCAW process?
A
93% to 97%
B
80% to 86%
C
70% to 76%
D
60% to 67%
‹
1
2
...
12
13
14
15
16
17
18
19
20
21
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...