QuizApp
Home
Teacher
Login
Register
Guest Mode
Student
Login
Register
Guest Mode
Dashboard
Study MCQ
WorkShop Calculation and Science
Module - 6: ESTIMATION AND COSTING
Set 4
Set 4
Practice Mode
Share
Prev
Next
Set Completed!
0
/
5
0%
Next Set
Q12733
Permalink
Report
Who prepares the cost of estimation?
A
Operator
B
Quality Inspector
C
Estimator
D
Draughts man
Q12734
Permalink
Report
Which one is included in machining estimation sheet?
A
Transport cost
B
Advertisement cost
C
Raw material cost
D
Tax
Q12735
Permalink
Report
What is the minimum permissible size of aluminium wire used in estimation?
A
1.5 sq.mm
B
2.5 sq.mm
C
5 sq.mm
D
3.5 sq.mm
Q12736
Permalink
Report
What is the minimum permissible area of conductor (U/G cable) for three and half cores cable?
A
25 sq.mm
B
50 sq.mm
C
5 sq.mm
D
100 sq.mm
Q12737
Permalink
Report
Which one is the most reliable estimate?
A
Preliminary estimate
B
Plinth area estimate
C
Cube rate estimate
D
Detailed estimate
‹
1
2
3
4
5
6
7
8
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...