QuizApp
Home
Teacher
Login
Register
Guest Mode
Student
Login
Register
Guest Mode
Dashboard
Study MCQ
WorkShop Calculation and Science
Module - 6: ESTIMATION AND COSTING
Set 1
Set 1
Practice Mode
Share
Next
Set Completed!
0
/
5
0%
Next Set
Q12718
Permalink
Report
What is the other term used for reference table?
A
Dictionary
B
Biography
C
Bibliography
D
Information Table
Q12719
Permalink
Report
Which hand book referred by machine engineer?
A
Parry's cheorikal
B
CRC
C
Mark standard
D
Oxford Dictionary
Q12720
Permalink
Report
What is a hand book?
A
Model book of various works
B
Type of reference work or other collection of instruction
C
Design book of latest works
D
Dictionary of materials
Q12721
Permalink
Report
Which standard schedule of rates to be considered for estimation?
A
Standard schedule of rates of the last year
B
Standard schedule of rates of the average of the last 10 years
C
Standard schedule of rates of the average of last 5 years
D
Standard schedule of rates of the current year
Q12722
Permalink
Report
What is an over estimate?
A
When an estimate is exceeded to actual estimate
B
When an estimate is fell short of the actual estimate
C
When an estimate perfectly matches the actual estimate
D
No work started as per estimate
‹
1
2
3
4
5
6
7
8
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*