Q11386
Permalink
Which levelling is done to connect the B.M to any intermediate point of the alignment for checking the accuracy of the work?
Q11387
Permalink
Which levelling is only the back sight and fore sight readings are taken at every set up of the level and no distance are measured along the direction of levelling?
Q11388
Permalink
What is the name of level, if the fly levelling done at the end of day's work to connect the finishing point with the starting point on that particular day?
Q11389
Permalink
Which method gives approximate result and so it is adopted in the reconnaissance or in the preliminary survey?
Q11390
Permalink
What is the name of the levelling while the relative elevations of different points are obtained by measuring the vertical angles and horizontal distance?