What is the unit of measurement in MKS system for earthwork excavation in ordinary soil?
A
10M<sup>3</sup>
B
M<sup>3</sup>
C
M<sup>2</sup>
D
10M<sup>2</sup>
Q11219
Permalink
Report
Which Indicates incidental expense of miscellaneous character in an estimate ?
A
Contingency
B
External services
C
Work-charged establishment
D
Centage charges
Q11220
Permalink
Report
Which is preposed as a guidance for the execution of work?
A
General specification
B
Brief specification
C
Rough cost Estimate
D
Detailed specification
Q11221
Permalink
Report
What are the essential drawing date required for the preparation of an Estimate?
A
Plan and Section
B
Elevation and Section
C
Plan and Elevation
D
Plan, Sectional Elevation and detailed drawings
Q11222
Permalink
Report
What is the useful area or the liveable area of a building?
A
Plinth
B
Circulation
C
Floor
D
Carpet
‹
1
2
3
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...