Q3065
Permalink
Report
What is the approximate depth of vertical sheeting adopted in timbering in soft ground?
A
10m
B
12m
C
15m
D
17m
Q3066
Permalink
Report
What is the minimum period for the removal of props to beams and arches for a span of 6m in centrering / form work?
A
10 Days
B
14 Days
C
17 Days
D
20 Days
Q3067
Permalink
Report
What is the maximum suitable distance between the two adjacent parallel walls for single flying shore?
A
5 m
B
9 m
C
15 m
D
18 m
Q3068
Permalink
Report
Which shoreing is suitable, for existing foundations to be depended?
A
Dead shore
B
Flying shore (Single)
C
Flying shore (Double)
D
Raking shore
Q3069
Permalink
Report
How to rectify if settlement of existing foundation has taken place?
A
By timbering
B
Under pinning
C
Single scaffolding
D
Independent scaffolding
‹
1
2
...
5
6
7
8
9
10
11
12
13
14
›
Report Question Issue
Your Name (Optional)
Your Email (Optional)
What do you think is the correct answer?
*
-- Select the correct answer --
A
B
C
D
Select which option you believe is the correct answer.
Feedback
*
Verify you're human
*
Loading...