Quiz Questions

ITI Quiz - 01-May-2026 09:02 PM (ITISKILL3108KC)

Question 1 1 Marks
What is a under estimate?
A
No work started as per estimate
B
An estimate perfectly matches with actual
C
An estimate is fell short of the actual estimate
D
An estimate is exceeded the actual estimate
Question 2 1 Marks
What cables are used for 132KV lines?
A
High tension
B
Super tension
C
Extra high tension
D
Extra super voltage
Question 3 1 Marks
Which hand book referred by machine engineer?
A
Parry's cheorikal
B
CRC
C
Mark standard
D
Oxford Dictionary
Question 4 1 Marks
Which one is related to estimation of work?
A
Bill of material
B
Packing
C
Information table
D
Hand book
Question 5 1 Marks
What is the total labour charges for a particular wiring work completed in 2 days by one electrician and one helper.(Electrician @ ?800/day and helper @ Rs 400/day)
A
Rs. 2000
B
Rs. 2400
C
Rs. 3000
D
Rs. 1400
Question 6 1 Marks
Which authority publishes schedule of rates?
A
Individual
B
Corporate
C
Partnership firm
D
Government department
Question 7 1 Marks
What is the weight of the iron ball has volume of 250 cc and density 7.5 gm/cc?
A
1750 gram
B
1875 gram
C
1975 gram
D
1785 gram
Question 8 1 Marks
What is an over estimate?
A
When an estimate is exceeded to actual estimate
B
When an estimate is fell short of the actual estimate
C
When an estimate perfectly matches the actual estimate
D
No work started as per estimate
Question 9 1 Marks
What is the weight of a rectangular block of a cost iron of 250cm X 20cm X 8cm (density of cast iron is 7.8 gm/cm<sup>3</sup>)?
A
312 kg
B
372 kg
C
410 kg
D
525 kg
Question 10 1 Marks
What is the total cost to assemble 10 personal computer systems, spares cost as given for one system: 1 TB hard disc Rs.4500/-, Intel i3 mother board Rs.7000/-, SMPS Rs.2500/-, monitor Rs.6000/-, keyboard Rs.1000/-, other material cost (Switches, USB, Cabl
A
Rs.275000/-
B
Rs.250000/-
C
Rs.225000/-
D
Rs.265000/-
Question 11 1 Marks
What is a total cost?
A
Raw material cost only
B
Machining cost only
C
Raw materials cost and machining cost
D
Advertisement cost only
Question 12 1 Marks
Who prepares the cost of estimation?
A
Operator
B
Quality Inspector
C
Estimator
D
Draughts man
Question 13 1 Marks
What is the name of a booklet, the rates of various terms are indicated?
A
Price bank
B
Price bunch
C
Price tag
D
Price catalogue
Question 14 1 Marks
What is the other term of pocket reference in engineering works?
A
Hand tool
B
Hand book
C
Good book
D
New book
Question 15 1 Marks
What is the minimum permissible area of conductor (U/G cable) for three and half cores cable?
A
25 sq.mm
B
50 sq.mm
C
5 sq.mm
D
100 sq.mm
Question 16 1 Marks
What is the term, for the details of materials, brand name, grade of quality, rating of current and voltage etc.?
A
Drawing
B
Specification of materials
C
Raw materials
D
Price catalogue
Question 17 1 Marks
Which one is the most reliable estimate?
A
Preliminary estimate
B
Plinth area estimate
C
Cube rate estimate
D
Detailed estimate
Question 18 1 Marks
What describes the detailed specification for the item of work?
A
Quality, Quantity, Workmanship, Method of execution
B
Colour
C
Tax, Transport, Overhead expenses
D
Maintenance, Stock, Cost
Question 19 1 Marks
What is the estimation of milling cost of a rectangular block size 100 X 80 X60 mm, if cost of the milling is Rs.2/sq.cm?
A
Rs.652/-
B
Rs.752/-
C
Rs.572/-
D
Rs.960/-
Question 20 1 Marks
What is the other term used for reference table?
A
Dictionary
B
Biography
C
Bibliography
D
Information Table
Question 21 1 Marks
What is the relative permittivity of rubber?
A
Between 2 and 3
B
Between 5 and 6
C
Between 8 and 10
D
Between 12 and 14
Question 22 1 Marks
Which of the impurity in cast iron makes it hard and brittle?
A
Silicon
B
Sulphur
C
Manganese
D
Phosphorus
Question 23 1 Marks
What is the minimum permissible size of aluminium wire used in estimation?
A
1.5 sq.mm
B
2.5 sq.mm
C
5 sq.mm
D
3.5 sq.mm
Question 24 1 Marks
What is the total wattage in a room if 2 tube lights of 50W rating, 2 fans of 80W rating, 2 numbers of light points of 60W rating, one fan point of 60W rating and one 3 pin socket of 100W rating?
A
340 W
B
440 W
C
540 W
D
640 W
Question 25 1 Marks
What is the term used for the method of calculating various quantities and expenditure on a particular job or process?
A
Estimation
B
Drawing
C
Specification
D
Plan
Question 26 1 Marks
What is the total estimation cost for making the component of 8 drilled hole dia 10 mm and 4 Numbers of M6 taps in the plate, if Rs.8/- per drilled holes and Rs.12 per drill and tap?
A
Rs.102
B
Rs.100
C
Rs.112
D
Rs.110
Question 27 1 Marks
Which one is included in machining estimation sheet?
A
Transport cost
B
Advertisement cost
C
Raw material cost
D
Tax
Question 28 1 Marks
What is the total construction cost of a house construction area of 3000 sq.ft. (cost of construction Rs.2000/- per sq.ft including material and labour)?
A
Rs.30,000,000
B
Rs.60,00,000
C
Rs.6,00,000
D
Rs.6,000,000
Question 29 1 Marks
What is the total cost of Air-conditioners installed in a college, 40 class room-each 1 Air-conditioner, Computer lab 5 Air- conditioners and conference hall 5 Air-conditioners (Cost of one air conditioner Rs.30000/- including installation)?
A
Rs.10 lakhs
B
Rs. 20 lakhs
C
Rs. 12 lakhs
D
Rs. 15 lakhs
Question 30 1 Marks
What is the main factor to be considered while preparing a detailed estimate?
A
Shape of material
B
Brand of the materials
C
Quantity, availability and transportation of materials
D
Location of material
Question 31 1 Marks
What percentage of water absorbed by a good building stone?
A
Less than 10%
B
Less than 20%
C
Less than 8%
D
Less than 5%
Question 32 1 Marks
Which specification is other than general specification?
A
Brief specification
B
Bulk specification
C
Detailed specification
D
Main specification
Question 33 1 Marks
What is a hand book?
A
Model book of various works
B
Type of reference work or other collection of instruction
C
Design book of latest works
D
Dictionary of materials
Question 34 1 Marks
What is the total cost of painting of a class room including ceiling, if the size of length is 6m, breadth is 5m and height is 4m. (Painting + labour cost Rs.150/- per sq.m)
A
Rs.15000/-
B
Rs.16700/-
C
Rs.17700/-
D
Rs.18700/-
Question 35 1 Marks
What is the use of engineering drawing?
A
For estimation of material and execution of work
B
For colourful appearance
C
For reducing the cost
D
For increasing the cost
Question 36 1 Marks
Which standard schedule of rates to be considered for estimation?
A
Standard schedule of rates of the last year
B
Standard schedule of rates of the average of the last 10 years
C
Standard schedule of rates of the average of last 5 years
D
Standard schedule of rates of the current year
Question 37 1 Marks
Which IE rules are to be verified on completion of wiring on any new installation?
A
IE Rules, 1956
B
IE Rules, 1960
C
IE Rules, 1961
D
IE Rules, 1967